Projects:
BERTH 3 replacement/ port headland, australia
Permadec supplied over 11 different panel shapes to cover the requirement of the deck shape and the spacing between the existing steel beams
Project Description:
Permadec Pty Ltd were originally chosen as a permanent formwork solution given the durability of the panels and the ease of installation.
Working with the incumbent engineer and client, Permadec Pty produced a detailed layout plan where the formwork would be used across 8 different sections of the deck. This required a coordinated production and delivery plan to ensure panels arrived at site in the correct order and sequence.
As a first for the client and the TAMS group, the feedback we have had from site is that our formwork was a much easier system to install than their usual material of choice. They were also very impressed with the strength of our panels to hold a 250mm to 300mm deck across the berth during an insitu concrete pour.
Key facts:
- We designed, manufactured and supplied over 5200m2 of GRP permanent formwork
- Coordination of delivery to site of 12 400 containers from the UK to Perth and then on to site at Port Hedland
- Construction managed in different time windows to suit the active running of the berth and weather conditions
Project: Berth 3 Replacement Project
Employer: Pilbara Port Authority
Engineer: Wallbridge Gilbert Aztec (WGA)
Contractor: TAMS Group
Stage: Completed
Standard
Haunched
Cantilever
Complete Solution