Project Description:
Permadec was engaged in the Majors Road Interchange project in Adelaide, working alongside the Department for Infrastructure and Transport, Acciona, and WGA to supply over 800m² of GRP permanent formwork. This innovative formwork solution enhanced onsite efficiency, reduced costs, and accelerated installation.
Scope of Work
- Skewed Panels for Structural Alignment: Standard panels were skewed to suit the alignment of the structure, minimising onsite modifications and optimising installation.
- A1 Type Panels for Seamless Integration: A1 type panels were supplied to be installed between the existing structure and the new structure, ensuring a smooth transition and structural consistency.
- Innovative Cantilever Panel Design: Permadec cantilever panels were designed and supplied with an upstand, eliminating the need for additional edge formwork. These panels required no support from beneath, significantly improving efficiency.
Project Benefits
- Enhanced Onsite Efficiency: The use of cantilever panels reduced material requirements and labour costs.
- Rapid Installation: All panels were installed in just four days, an exceptionally fast turnaround.
- Minimal Equipment Requirement: 90% of panels were installed manually, reducing reliance on heavy machinery and improving site accessibility.
By collaborating with the Department for Infrastructure and Transport, Acciona, and WGA, Permadec played a key role in the successful delivery of the Majors Road Interchange, contributing to a more efficient and cost-effective construction process.
Project: Majors Road Interchange
Client: Department for Infrastructure and Transport South Australia
Main Contractor: Acciona
Engineering Consultant: WGA
Stage: Delivered